Public Jobs

Bidding Closed
8/20/20 3:00 pm
Lakeland Village Utility Replacement
Century West Engineering
Medical Lake, WA
The Work comprises the removal and installation of steam piping, condensate piping, water piping, electrical conduit, associated valves, piping accessories, insulation, excavation/backfill (for site piping), concrete patching, and connections to existing piping systems.
Bidding Closed
8/13/20 3:00 pm
AHCC Reclaimed Water Implementation
Century West Engineering
Airway Heights, WA
The Work will consist of construction of reclaimed water main pipe ranging in size from 1” to 8” in diameter across the AHCC Campus, two trenchless undercrossings, connection of the reclaimed water main to 6 irrigation system connection points, connection of the reclaimed water main to the boiler building including a backup potable water connection, connection of the reclaimed water main to the laundry facility including a backup potable water connection, surface restoration for the pipeline, and all other work necessary to complete the project as defined in the contract plans and these specifications.
Bidding Closed
8/4/20 1:00 pm
Inchelium Highway Repairs
Century West Engineering
Ferry County, WA
The project generally consists of reconstructing approximately 425 feet of roadway, including 18,251 C.Y of Roadway Excavation, 20,074 C.Y. of imported gravel borrow, 343 tons of asphalt paving, 450 feet of Type 31 Beam Guardrail, drainage improvements, traffic control and related site restoration.
Bidding Closed
7/2/20 11:00 am
2020 Water System Improvements Project
Century West Engineering
Lind, WA
The 2020 Water System Improvements Project consists of constructing approximately 2000 feet of 8-inch PVC water main, replacing select water meters, installing a variable frequency drive (VFD) and motor at Well #8, and installing a new fire hydrant at the intersection of 3rd Street and Wahl Lane. The water main work consists of approximately 1300 feet along 7th Street and approximately 700 feet along Lutcher Ave. The water main work includes select replacement of street surfacing. Well #8 is located at the north east corner of 1st Street and Michigan Ave. The well is housed in a building with a removable shell. The work will include removing the existing soft start and motor as well as installing the new VFD and motor.
Bidding Closed
5/29/20 11:00 am
Fairfield 2020 Patching & Crack Sealing
Century West Engineering
Fairfield, WA
Schedule A Base Bid work consists of completing approximately 600 square yards of pavement patching, including sawcutting, removal of existing pavement, and placing new crushed surfacing and HMA and crack sealing along Carlton Road from First St (SR-27) to 3rd and along Main Street, McNeil Street, Ticknor Street, and Fairweather Street surrounding the Town’s Upper Park. Schedule B Additive Alternate work consists of approximately 400 square yards of additional pavement patching that will be completed as funding allows.
Bidding Closed
5/1/20 10:00 am
Electric City Lift Station Replacement Project
Century West Engineering
Electric City, WA
The project generally consists of demolition and replacement of the existing lift station with a new package lift station. One of the pumps in the existing lift station will be salvaged and used in the new lift station and the existing building will be preserved and control panels installed inside this building. The project will also include approximately 50 feet of 10-inch PVC gravity sewer main and 50 feet of 6-inch force main and associated work. In addition to replacement of the lift station this project will include installation of a new package backup generator.
Bidding Closed
5/8/20 5:00 pm
Northport Reservoir Project
Century West Engineering
Northport, WA
Construction of a new 118,000 gallon storage reservoir and associated piping and electrical work.
Bidding Closed
4/30/20 9:00 am
Greenridge Water System and Booster Station Improvements
Century West Engineering
Liberty Lake, WA
Construction of approximately 8515 feet of new 10-inch and 8-inch water main. Installation of three new booster station pumps and associated piping, electrical and control work for the new booster pumps in an existing building, new fire hydrants PRVs and other appurtenances.
Bidding Closed
4/16/20 11:00 am
Fairfield First Street Sidewalk, Phase 2
Century West Engineering
Fairfield, WA
The project generally consists of constructing approximately 340 feet of new 5-ft wide concrete sidewalk from Portland Ave. to Spokane Ave. Related work includes new concrete curb & gutter, pedestrian ramps, minor drainage improvements, asphalt patching, surface restoration, and related work.
Bidding Closed
3/31/20 2:00 pm
East Side Water Improvements Project Phase 2 - Liberty Lake
Century West Engineering
Liberty Lake, WA
Construction of a 3,538 feet of 8” water main, 460 feet of 6” water main, including 37 service connections and all appurtenances as shown in these contract documents.