Public Jobs

Bids due in 3 days
5/29/20 11:00 am
Fairfield 2020 Patching & Crack Sealing
Century West Engineering
Fairfield, WA
Schedule A Base Bid work consists of completing approximately 600 square yards of pavement patching, including sawcutting, removal of existing pavement, and placing new crushed surfacing and HMA and crack sealing along Carlton Road from First St (SR-27) to 3rd and along Main Street, McNeil Street, Ticknor Street, and Fairweather Street surrounding the Town’s Upper Park. Schedule B Additive Alternate work consists of approximately 400 square yards of additional pavement patching that will be completed as funding allows.
Bidding Closed
5/1/20 10:00 am
Electric City Lift Station Replacement Project
Century West Engineering
Electric City, WA
The project generally consists of demolition and replacement of the existing lift station with a new package lift station. One of the pumps in the existing lift station will be salvaged and used in the new lift station and the existing building will be preserved and control panels installed inside this building. The project will also include approximately 50 feet of 10-inch PVC gravity sewer main and 50 feet of 6-inch force main and associated work. In addition to replacement of the lift station this project will include installation of a new package backup generator.
Bidding Closed
5/8/20 5:00 pm
Northport Reservoir Project
Century West Engineering
Northport, WA
Construction of a new 118,000 gallon storage reservoir and associated piping and electrical work.
Bidding Closed
4/30/20 9:00 am
Greenridge Water System and Booster Station Improvements
Century West Engineering
Liberty Lake, WA
Construction of approximately 8515 feet of new 10-inch and 8-inch water main. Installation of three new booster station pumps and associated piping, electrical and control work for the new booster pumps in an existing building, new fire hydrants PRVs and other appurtenances.
Bidding Closed
4/16/20 11:00 am
Fairfield First Street Sidewalk, Phase 2
Century West Engineering
Fairfield, WA
The project generally consists of constructing approximately 340 feet of new 5-ft wide concrete sidewalk from Portland Ave. to Spokane Ave. Related work includes new concrete curb & gutter, pedestrian ramps, minor drainage improvements, asphalt patching, surface restoration, and related work.
Bidding Closed
3/31/20 2:00 pm
East Side Water Improvements Project Phase 2 - Liberty Lake
Century West Engineering
Liberty Lake, WA
Construction of a 3,538 feet of 8” water main, 460 feet of 6” water main, including 37 service connections and all appurtenances as shown in these contract documents.
Bidding Closed
4/3/20 10:00 am
Kettle Falls and Northport 2021 Seal Coat
Century West Engineering
Kettle Falls and Northport, WA
The project generally consists of installation of 20,664 SY of double chip seal (seal coat) and final fog seal of select roadways in the Town of Northport and City of Kettle Falls.
Bidding Closed
3/31/20 2:00 pm
Lind - Cemetery Water Line
Century West Engineering
Lind, WA
The project generally consists of the construction of approximately 3,500 feet of 4” DR 18 C-900 water line as well as procurement and installation of a booster pump station and building in the Town of Lind. The purpose of the project is to supply the Cemetery north of Town with irrigation water. The booster pump station is located northwest of the intersection of 8th St and I St. The alignment of the water line is generally west from the booster pump station to the east side of Neilson Road and then north to the Town of Lind Cemetery. The booster pump station will be connected to the existing 10” main in the 8th St Right-of-Way.
Bidding Closed
3/26/20 2:00 pm
Runway 5/23 Shift/Extension - Davenport
Century West Engineering
Davenport, WA
The scope of work being considered is: 1. Demolition of existing runway (5-23) 2. Relocation and construction of new runway (6-24) including excavation, grading, and paving 3. Runway pavement markings 4. Airport drainage improvements 5. New airport electrical system 6. New airport lighting 7. New airport signage 8. New airport beacon 9. New airport windcone 10. Taxiway improvements.
Bidding Closed
3/10/20 10:00 am
Wilson to Solomon Utility Corridor Project
Century West Engineering
Bonners Ferry, ID
The work includes installation of approximately 1,500 feet of water main, 750 feet of gravity sewer main, hydrants, valves, manholes, and appurtenances. Roadway excavation work may also be included as an additive alternate.