Public Jobs

Bids due in 14 days
5/2/19 3:00 pm
Crosby Street and Park Street Reconstruction Project
Century West Engineering
Tekoa, WA
The project generally consists of the following work: The project will reconstruct Crosby Street from Main Street to Park Street and Park Street from Crosby Street to Howard Street. Base Bid Schedule work consists of reconstructing and widening approximately 1,050 linear feet of paved roadway, constructing new curb, sidewalk, pedestrian ramps, drainage improvements, pavement striping, and related appurtenances. Additive Alternate 1 work consists of the replacement of approximately 600 LF of 8” PVC sewer pipe and services, manholes, and other appurtenances. Additive Alternate 2 work consists of replacement of approximately 350 LF of 12” PVC water main, services and appurtenances. Additive Alternate 3 work consists of the replacement of an additional approximately 370 if 12” PVC water main, services and appurtenances.
Bids due in 12 days
4/30/19 10:30 am
Sprague Walkway Project
Century West Engineering
Kootenai, ID
The work includes construction of approximately 675 linear feet of sidewalk along Sprague Street and First Avenue, including excavation, culvert installation, and pedestrian ramps.
Bids due in 12 days
4/30/19 10:00 am
McGhee Road Cement Treated Base Project
Century West Engineering
Kootenai, ID
The work includes pulverization of the existing pavement, incorporation of Portland cement into the base, adjusting grade lines, and placement of plant mix pavement along approximately 1,425 linear feet of roadway.
Bidding Closed
3/28/19 11:00 am
Navar Street Pavement Rehabilitation Project - Wilson Creek
Century West Engineering
Wilson Creek
The project generally consists of 1,478 square yards of asphalt patching, 7,000 linear feet of crack sealing and related work. Additional work includes a quarry spall rip rap pad and
Bidding Closed
3/29/19 10:00 am
E 10th Avenue, 11th Avenue to Oak - Kettle Falls
Century West Engineering
Kettle Falls, WA
The project generally consists of the completion of the pedestrian corridor along W 11th and E 10th and the improvement of the bus route along E 10th. This will include completion of the corridor by installing 350ft of new sidewalk on 10th from Oak to Narcissus, 270ft of new sidewalk from the Intersection of Meyer to the crosswalk on 11th, and 265ft of new sidewalk along the South side of the intersection of W 10th, E 10th, Meyer, and 11th. All sidewalks will be 6ft wide and there will be 10 ADA compliant ramps installed. E10th as well as the intersection of 10th, Meyer, and 11th will be removed and replaced with new base and asphalt pavement. The road width will be decreased to 25 feet and the shoulders treated with crushed asphalt from the pulverization of the existing roadway. An additive alternate to the base bid includes installation of 1,500ft of new sidewalk will be added to the South side of West 10th Ave.
Bids due in 7 days
4/25/19 10:00 am
Town of Odessa Phase II - Streets and Water - Odessa
Century West Engineering
Odessa, WA
The Project consists of constructing pavement repairs at various locations and installation of water mains, connections, meters, and associated work at various locations in Town.
Bidding Closed
3/27/19 10:00 am
2018 Frost Heave Phase II - Lind
Century West Engineering
Lind, WA
The project generally consists of the removal and replacement of asphalt roadway sections at specific locations on, 6th Street and 3rd Street, as well as, drainage improvements at 3rd & I Streets.
Bidding Closed
3/7/19 10:00 am
Schweitzer Mountain Road Repairs - Bonner County
Century West Engineering
Bonner County
The work includes four schedules of work: Schedule A includes excavation of existing pavement, adjusting grade lines, and placement of crushed aggregate and plant mix pavement along approximately 3,000 linear feet of roadway; Schedule B includes a 3-inch plant mix pavement overlay along approximately 5,460 linear feet of roadway; Schedule C includes a 3-inch plant mix pavement overlay along approximately 16,430 linear feet of roadway; Schedule D includes a 2-inch plant mix pavement overlay along approximately 4,380 linear feet of roadway. It is the intent of these documents to describe the work required to complete this project in sufficient detail to secure comparable bids. All parts or work not specifically mentioned which are necessary in order to provide a complete installation shall be included in the bid and shall conform to all Local, State and Federal requirements.
Bidding Closed
3/7/19 11:00 am
Main Street Sidewalk Resurfacing (Re-Bid) - Fairfield
Century West Engineering
Fairfield, WA
The project generally consists of resurfacing approximately 1,020 square yards of concrete sidewalk and
Bidding Closed
8/17/18 10:00 am
Newport South Bench Reservoir, Wells and Waterline Project
Century West Engineering
Newport, Eastern WA
The Project consists of constructing a new water reservoir, developing two existing potable water wells, a water booster station, a green sand water treatment facility, electrical improvements and approximately 3,000 LF of water distribution main. Scope of work includes the following: Division 1 - General Requirements, Division 4 - Masonry, Division 5 - Metals, Division 6 - Wood Plastics and Composites, Division 7 - Thermal and Moisture Protection, Division 8 - Openings - Door and Windows, Division 9 - Finishes, Division 11 - Equipment, Division 13 - Special Construction, Division 15 - Mechanical, Division 16 - Electrical