Public Jobs

Bids due in 32 days
4/30/20 9:00 am
Greenridge Water System and Booster Station Improvements
Century West Engineering
Liberty Lake, WA
Construction of approximately 8515 feet of new 10-inch and 8-inch water main. Installation of three new booster station pumps and associated piping, electrical and control work for the new booster pumps in an existing building, new fire hydrants PRVs and other appurtenances.
Bids due in 18 days
4/16/20 11:00 am
Fairfield First Street Sidewalk, Phase 2
Century West Engineering
Fairfield, WA
The project generally consists of constructing approximately 340 feet of new 5-ft wide concrete sidewalk from Portland Ave. to Spokane Ave. Related work includes new concrete curb & gutter, pedestrian ramps, minor drainage improvements, asphalt patching, surface restoration, and related work.
Bids due in 2 days
3/31/20 2:00 pm
East Side Water Improvements Project Phase 2 - Liberty Lake
Century West Engineering
Liberty Lake, WA
Construction of a 3,538 feet of 8” water main, 460 feet of 6” water main, including 37 service connections and all appurtenances as shown in these contract documents.
Bids due in 5 days
4/3/20 10:00 am
Kettle Falls and Northport 2021 Seal Coat
Century West Engineering
Kettle Falls and Northport, WA
The project generally consists of installation of 20,664 SY of double chip seal (seal coat) and final fog seal of select roadways in the Town of Northport and City of Kettle Falls.
Bids due in 2 days
3/31/20 2:00 pm
Lind - Cemetery Water Line
Century West Engineering
Lind, WA
The project generally consists of the construction of approximately 3,500 feet of 4” DR 18 C-900 water line as well as procurement and installation of a booster pump station and building in the Town of Lind. The purpose of the project is to supply the Cemetery north of Town with irrigation water. The booster pump station is located northwest of the intersection of 8th St and I St. The alignment of the water line is generally west from the booster pump station to the east side of Neilson Road and then north to the Town of Lind Cemetery. The booster pump station will be connected to the existing 10” main in the 8th St Right-of-Way.
Bidding Closed
3/26/20 2:00 pm
Runway 5/23 Shift/Extension - Davenport
Century West Engineering
Davenport, WA
The scope of work being considered is: 1. Demolition of existing runway (5-23) 2. Relocation and construction of new runway (6-24) including excavation, grading, and paving 3. Runway pavement markings 4. Airport drainage improvements 5. New airport electrical system 6. New airport lighting 7. New airport signage 8. New airport beacon 9. New airport windcone 10. Taxiway improvements.
Bidding Closed
3/10/20 10:00 am
Wilson to Solomon Utility Corridor Project
Century West Engineering
Bonners Ferry, ID
The work includes installation of approximately 1,500 feet of water main, 750 feet of gravity sewer main, hydrants, valves, manholes, and appurtenances. Roadway excavation work may also be included as an additive alternate.
Bidding Closed
2/6/20 10:00 am
Town of Endicott 2020 Roadway Improvements Project
Century West Engineering
Endicott, WA
The project generally consists of the removcal and replacement of asphalt roadway sections, sidewalk replacement, and associated storm drainage at specific locations throughout the Town of Endicott.
Bidding Closed
1/23/20 3:00 pm
Crosby Street and Park Street Reconstruction Project Re-Bid
Century West Engineering
Tekoa, WA
The project will reconstruct Crosby Street from Main Street to Park Street and Park Street from Crosby Street to Howard Street. Base Bid Schedule work consists of reconstructing and widening approximately 1,050 linear feet of paved roadway, constructing new curb, sidewalk, pedestrian ramps, drainage improvements, pavement striping, and related appurtenances. Additive Alternate 1 work consists of the replacement of approximately 600 LF of 8” PVC sewer pipe and services, manholes, and other appurtenances. Additive Alternate 2 work consists of replacement of approximately 350 LF of 12” PVC water main, services and appurtenances. Additive Alternate 3 work consists of the replacement of an additional approximately 370 lf 12” PVC water main, services and appurtenances.
Bidding Closed
11/12/19 1:00 pm
Cache Creek Road Slide Repairs
Century West Engineering
Ferry County, WA
Base Bid Schedule ‘A’, Lower Cache Creek, generally consists of reconstructing approximately 150 feet of roadway, including 102 C.Y. of Roadway Excavation, 148 C.Y. of imported gravel borrow, 65 tons of asphalt paving, 95 feet of Type 31 Beam Guardrail, traffic control and related site restoration. Base Bid Schedule ‘B’, Upper Cache Creek, generally consists of reconstructing approximately 175 feet of roadway, including 4,125 C.Y of Roadway Excavation, 4,853 C.Y. of imported gravel borrow, 137 tons of asphalt paving, 175 feet of Type 31 Beam Guardrail, drainage improvements, traffic control and related site restoration.