2021 Sewer I&I Reduction Project - Garfield
Century West Engineering
Garfield, WA
Installation of select manholes, minor sewer main installation/replacement, manhole cover excavation and adjustment. Cleaning, CCTV (pre and post) CIPP lining, and service cutouts of select sewer mains within the Town of Garfield.
Bidding Closed
7/30/21 10:00 am
2021 Sewer I&I Reduction Project - Endicott
Century West Engineering
Endicott, WA
The 2021 Sewer I&I Reduction Project consists of CIPP pipe lining of select segments of sewer main, replacement of limited amounts of sewer main, and limited prep work. Alternate 1 includes lining of select sewer manholes.
Bidding Closed
7/9/21 10:00 am
2021 Schweitzer Mountain Road Overlay
Century West Engineering
Bonner County, ID
The work includes plant mix pavement overlay of Schweitzer Mountain Road in two segments: Segment 1 consisting of approximately 4224 linear feet with a 3-inch overlay, Segment 2 consisting of approximately 4283 linear feet with a 1.5-inch overlay. Work will include traffic control, stormwater management, shoulder treatment, and related work.
Bidding Closed
7/19/21 1:00 pm
Bridge Painting (Boulder Creek Bridge)
Century West Engineering
Ferry County, WA
Base Bid Schedule ‘A’, Boulder Creek Bridge, consists of stripping and repainting Boulder Creek Bridge and related work.
Bidding Closed
7/15/21 10:00 am
Flood Damage Repair Project
Century West Engineering
Sprague
The project generally consists of the following work: Replacement of the H Street Bridge; erosion repairs at B Street, C Street, D Street, Alder Street, and First Street; and roadway repairs at Colfax Street and Walnut. The work consists of a Base Bid and three (3) Additive Alternates. Thirty (30) working days will be allowed to complete the Base Bid, not including material lead times. Depending on the Additive Alternates awarded, a maximum of Twenty-five (25) additional working days will be allowed.
Bidding Closed
6/29/21 10:00 am
Garden Lane Road Improvements
Century West Engineering
Bonners Ferry
The work includes widening and reconstruction of approximately 650 feet of roadway, 300 feet of concrete sidewalk, 310 feet of asphalt pathway, stormwater improvements, and related work. It is the intent of these documents to describe the work required to complete this project in sufficient detail to secure comparable bids. All parts or work not specifically mentioned which are necessary in order to provide a complete installation shall be included in the bid and shall conform to all Local, State and Federal requirements. A non-mandatory pre-Bid conference will be held at 10:00 a.m. local time on Tuesday, June 22, 2021 at Bonners Ferry City Hall, 7232 Main Street, Bonners Ferry, ID.
Bidding Closed
6/24/21 3:00 pm
MCC Biosolids Removal Project
Century West Engineering
Monroe, WA
1. Coordinating the Work, including coordination between trades, subcontractors, suppliers, public utilities, and the Owner to ensure the progress of work. 2. Potholing existing utilities prior to the start of Work. 3. Partial removal of the existing 24-inch sewage pipe coming from the headworks to the aerated lagoon. 4. Demolition of electrical, and controls as shown on the drawings. 5. Install a new cast in place concrete or precast concrete open channel and pre-cast concrete lift station. 6. Install a new precast concrete valve vault, including piping, valves and appurtenances at the force main connection point and shown on the drawings. 7. Excavation, imported structural backfill, compaction (i.e., subgrade native soils, structural fill, HMA and gravel patching repair) and surface restoration for the structural structures and force main per Section 31 22 05. 8. Provide and place between the compacted subgrade (or native soils) and the overlying imported structural fill a separation barrier of Mirafi 160 N, or approved alternate. 9. Provide and place imported pipe bedding material. 10. Install two (2) new submersible pumps with piping, valving, miscellaneous appurtenances, instruments, controls at the new lift station. 11. Install a new 24-inch DIP overflow pipe from the lift station back to the Aerated Lagoon No. 1. Liner replacement or patching will be needed to accommodate for the 24-inch diameter DIP overflow pipe. 12. Two (2) new SST slide gates and serrated stainless-steel grating will be installed at the open channel and as shown on the drawings. 13. Leak testing hydraulic concrete structures. 14. Pressure testing or leak testing pipelines. 15. Provide a professional testing company for field quality control services to meet structural fill, concrete, and HMA and gravel patching specification requirements and equipment testing in accordance with Section Starting of Systems 16. See Section 26 00 01—Electrical Scope of Work 17. The biosolids in Lagoon No. 2, Section 1 shall be removed, transported, and disposed of offsite to an approved landfill or disposal site at Contractor’s expense. A total of 90 dry tons can be removed. The Contractor must dispose the biosolids in accordance with all Federal, State, and local laws and shall submit a “Removal, Transport and Disposal Plan” for approval by Owner and Engineer. Onsite removal of the biosolids material and the biosolids quality data is provided in the Fire Mountain Farms, Inc found in Appendix A of these specifications. 18. Other work necessary to complete the project as defined in the contract.
Bidding Closed
6/18/21 11:00 am
2021 Patching & Crack Sealing Project
Century West Engineering
Nespelem, WA
Base Bid work consists of completing approximately 200 square yards of pavement patching, including sawcutting, removal of existing pavement, and placing new crushed surfacing and HMA and crack sealing along 9th, 10th, 8th, C, D, and E streets.
Bidding Closed
6/11/21 10:00 am
College Ln. Water Main Installation Project
Century West Engineering
Kettle Falls, WA
The project generally consists of the following work: Equipment and labor (no materials) necessary to install 2,700 linear feet of water main, connections, and associated work as detailed in the Contract Documents. The City shall provide all materials.
Bidding Closed
5/11/21 3:00 pm
WCC Reclaimed Water (Re-Bid)
Century West Engineering
Shelton, WA
The Work will consist of construction of reclaimed water main pipe ranging in size from 1” to 8” in diameter across the WCC Campus, two trenchless undercrossings, connection of the reclaimed water main to irrigation system connection points, connection of the reclaimed water main to the boiler building including a backup potable water connection, connection of the reclaimed water main to the laundry facility including a backup potable water connection, surface restoration for the pipeline, and all other work necessary to complete the project as defined in the contract plans and these specifications.