Public Jobs

Bidding Closed
11/12/19 1:00 pm
Cache Creek Road Slide Repairs
Century West Engineering
Ferry County, WA
Base Bid Schedule ‘A’, Lower Cache Creek, generally consists of reconstructing approximately 150 feet of roadway, including 102 C.Y. of Roadway Excavation, 148 C.Y. of imported gravel borrow, 65 tons of asphalt paving, 95 feet of Type 31 Beam Guardrail, traffic control and related site restoration. Base Bid Schedule ‘B’, Upper Cache Creek, generally consists of reconstructing approximately 175 feet of roadway, including 4,125 C.Y of Roadway Excavation, 4,853 C.Y. of imported gravel borrow, 137 tons of asphalt paving, 175 feet of Type 31 Beam Guardrail, drainage improvements, traffic control and related site restoration.
Bidding Closed
9/6/19 9:00 am
Greenridge Reservoir and Booster Station Upgrade Project
Century West Engineering
Liberty Lake, WA
Construction of a new 141,000 gallon concrete storage reservoir and associated piping. Installation of two new booster station pumps and removal of an existing booster pump in the District’s Lake Ridge booster station. Associated piping and electrical work for the new booster pumps.
Bidding Closed
7/15/19 10:00 am
395 Water Main Project - Kettle Falls
Century West Engineering
Kettle Falls, WA
The project generally consists of the following work: Installation of 323 ft of 8-inch water main by trenchless and open cut methods. Installation of connections to existing mains at both ends, and all related work.
Bidding Closed
6/21/19 11:00 am
City of Davenport Sports Complex Recreation Trail, Phase 1
Century West Engineering
Davenport, WA
The project generally consists of constructing approximately 2,240 feet of new 10-ft wide asphalt shared use pathway with 2-ft wide gravel shoulders from McInnis Road to SR-25. Related work includes minor drainage improvements, and surface restoration.
Bidding Closed
5/7/19 3:30 pm
LLSWD South Liberty Drive Water Main Replacement and Repaving
Century West Engineering
Liberty Lake, WA
The base bid work generally consists of constructing approximately 3,300 feet of 8-inch ductile iron water line, valves, service lines, new fire hydrants, surface restoration, asphalt paving and related appurtenances.
Bidding Closed
5/2/19 3:00 pm
Crosby Street and Park Street Reconstruction Project
Century West Engineering
Tekoa, WA
The project generally consists of the following work: The project will reconstruct Crosby Street from Main Street to Park Street and Park Street from Crosby Street to Howard Street. Base Bid Schedule work consists of reconstructing and widening approximately 1,050 linear feet of paved roadway, constructing new curb, sidewalk, pedestrian ramps, drainage improvements, pavement striping, and related appurtenances. Additive Alternate 1 work consists of the replacement of approximately 600 LF of 8” PVC sewer pipe and services, manholes, and other appurtenances. Additive Alternate 2 work consists of replacement of approximately 350 LF of 12” PVC water main, services and appurtenances. Additive Alternate 3 work consists of the replacement of an additional approximately 370 if 12” PVC water main, services and appurtenances.
Bidding Closed
4/30/19 10:30 am
Sprague Walkway Project
Century West Engineering
Kootenai, ID
The work includes construction of approximately 675 linear feet of sidewalk along Sprague Street and First Avenue, including excavation, culvert installation, and pedestrian ramps.
Bidding Closed
4/30/19 10:00 am
McGhee Road Cement Treated Base Project
Century West Engineering
Kootenai, ID
The work includes pulverization of the existing pavement, incorporation of Portland cement into the base, adjusting grade lines, and placement of plant mix pavement along approximately 1,425 linear feet of roadway.
Bidding Closed
3/28/19 11:00 am
Navar Street Pavement Rehabilitation Project - Wilson Creek
Century West Engineering
Wilson Creek
The project generally consists of 1,478 square yards of asphalt patching, 7,000 linear feet of crack sealing and related work. Additional work includes a quarry spall rip rap pad and
Bidding Closed
3/29/19 10:00 am
E 10th Avenue, 11th Avenue to Oak - Kettle Falls
Century West Engineering
Kettle Falls, WA
The project generally consists of the completion of the pedestrian corridor along W 11th and E 10th and the improvement of the bus route along E 10th. This will include completion of the corridor by installing 350ft of new sidewalk on 10th from Oak to Narcissus, 270ft of new sidewalk from the Intersection of Meyer to the crosswalk on 11th, and 265ft of new sidewalk along the South side of the intersection of W 10th, E 10th, Meyer, and 11th. All sidewalks will be 6ft wide and there will be 10 ADA compliant ramps installed. E10th as well as the intersection of 10th, Meyer, and 11th will be removed and replaced with new base and asphalt pavement. The road width will be decreased to 25 feet and the shoulders treated with crushed asphalt from the pulverization of the existing roadway. An additive alternate to the base bid includes installation of 1,500ft of new sidewalk will be added to the South side of West 10th Ave.