Lind - Cemetery Water Line

The project generally consists of the construction of approximately 3,500 feet of 4” DR 18 C-900 water line as well as procurement and installation of a booster pump station and building in the Town of Lind. The purpose of the project is to supply the Cemetery north of Town with irrigation water. The booster pump station is located northwest of the intersection of 8th St and I St. The alignment of the water line is generally west from the booster pump station to the east side of Neilson Road and then north to the Town of Lind Cemetery. The booster pump station will be connected to the existing 10” main in the 8th St Right-of-Way.

Status

Accepting Bids

Bid Date3/31/20 2:00 pm

Company & Contacts

Century West Engineering

Patrick Sheehy   (509) 838-3810

Location

Lind, WA

Project Estimate: $195,000-$250,000

Bidders may download electronic files at no cost. Printed documents are available, at Bidders expense, by choosing the “Order” option.