Greenridge Reservoir and Booster Station Upgrade Project

Construction of a new 141,000 gallon concrete storage reservoir and associated piping. Installation of two new booster station pumps and removal of an existing booster pump in the District’s Lake Ridge booster station. Associated piping and electrical work for the new booster pumps.
  Plans (click to expand/collapse)
Order this section, price will be calculated by SQFT
This is available for download & digital takeoff to registered users Log in now
Order files below, price will be calculated by SQFT
Name Size
01 - G-01 - Cover 4.3 MB
02 - G-02 - Notes and Legend 2.3 MB
03 - CP-01 - Booster Station Modifications Existing Piping and Demo Plan 1.8 MB
04 - CP-02 - Booster Station Modifications Plan View 1.7 MB
05 - CP-03 - Booster Station Modifications Profile View and Outside Blackflow Prevention Detail 1.5 MB
06 - CP-04 - 141,000 Gallon Reservoir and Connecting Mains 2.8 MB
07 - CP-05 - Reservoir Tank Details 2.3 MB
08 - CP-06 - Reservoir Tank Details 2.5 MB
09 - CP-07 - Piping Connections and Reservoir Tank Details 2.2 MB
10 - E-1 - Electrical Legend 3.8 MB
11 - E-2 - Electrical One-Line Diagram - Existing 1.7 MB
12 - E-3 - Electrical One-Line Diagram - Revised 1.7 MB
13 - E-4 - Electrical Photo Detail 2.6 MB
14 - E-5 - Electrical Photo Detail 1.7 MB
15 - E-6 - Booster Station Floor Plan - Electrical 1.3 MB
16 - E-7 - Electrical Wiring Diagrams 1.4 MB
17 - E-8 - Electrical Wiring Diagrams 1.7 MB
18 - E-9 - Electrical Details 1.5 MB
19 - E-10 - Electrical Details 1.4 MB
20 - E-11 - Conduit and Wire Schedules 1.9 MB