Crosby Street and Park Street Reconstruction Project

The project generally consists of the following work: The project will reconstruct Crosby Street from Main Street to Park Street and Park Street from Crosby Street to Howard Street. Base Bid Schedule work consists of reconstructing and widening approximately 1,050 linear feet of paved roadway, constructing new curb, sidewalk, pedestrian ramps, drainage improvements, pavement striping, and related appurtenances. Additive Alternate 1 work consists of the replacement of approximately 600 LF of 8” PVC sewer pipe and services, manholes, and other appurtenances. Additive Alternate 2 work consists of replacement of approximately 350 LF of 12” PVC water main, services and appurtenances. Additive Alternate 3 work consists of the replacement of an additional approximately 370 if 12” PVC water main, services and appurtenances.
  Addendum #1 (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
3. Proposal Form Addendum 1 158.8 KB
Addendum 1 145.8 KB
Crosby Park St. Addendum 1 Drawings 8.8 MB
  Addendum #2 (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
Addendum 2 81.1 KB
PreBid Minutes 107.7 KB
  Addendum #3 (click to expand/collapse)
Name Size
Addendum 3 121.9 KB