E 10th Avenue, 11th Avenue to Oak - Kettle Falls

The project generally consists of the completion of the pedestrian corridor along W 11th and E 10th and the improvement of the bus route along E 10th. This will include completion of the corridor by installing 350ft of new sidewalk on 10th from Oak to Narcissus, 270ft of new sidewalk from the Intersection of Meyer to the crosswalk on 11th, and 265ft of new sidewalk along the South side of the intersection of W 10th, E 10th, Meyer, and 11th. All sidewalks will be 6ft wide and there will be 10 ADA compliant ramps installed. E10th as well as the intersection of 10th, Meyer, and 11th will be removed and replaced with new base and asphalt pavement. The road width will be decreased to 25 feet and the shoulders treated with crushed asphalt from the pulverization of the existing roadway. An additive alternate to the base bid includes installation of 1,500ft of new sidewalk will be added to the South side of West 10th Ave.

Status

Bidding Closed

Prebid Date3/15/19 10:00 am

Bid Date3/29/19 10:00 am

Company & Contacts

Century West Engineering

Steve Nelson, snelson@centurywest.com   (509) 838-3810

Location

Kettle Falls, WA

Project Estimate: $352,750 – $456,500

Bidders may download electronic files at no cost. Printed documents are available, at Bidders expense, by choosing the “Order” option.

A pre-bid conference will be held at 10:00 AM local time on March 15, 2019 at the Kettle Falls City Hall.