Newport South Bench Reservoir, Wells and Waterline Project

The Project consists of constructing a new water reservoir, developing two existing potable water wells, a water booster station, a green sand water treatment facility, electrical improvements and approximately 3,000 LF of water distribution main. Scope of work includes the following: Division 1 - General Requirements, Division 4 - Masonry, Division 5 - Metals, Division 6 - Wood Plastics and Composites, Division 7 - Thermal and Moisture Protection, Division 8 - Openings - Door and Windows, Division 9 - Finishes, Division 11 - Equipment, Division 13 - Special Construction, Division 15 - Mechanical, Division 16 - Electrical
  Plans (click to expand/collapse)
Order this section, price will be calculated by SQFT
This is available for download & digital takeoff to registered users Log in now
Order files below, price will be calculated by SQFT
Name Size
01 G-01 - Cover Sheet 1.9 MB
02 G-02 - Sheet Index, Legend and General Notes 2.6 MB
03 OP1 - Process and Instrumentation Diagram 1 of 4 896.5 KB
04 OP2 - Process and Instrumentation Diagram 2 of 4 1.3 MB
05 OP3 - Process and Instrumentation Diagram 3 of 4 1.1 MB
06 OP4 - Process and Instrumentation Diagram 4 of 4 703.4 KB
07 CU-01 - Water Main Plan and Profile STA 1 and 00 to STA 5 and 00 1.6 MB
08 CU-02 - Water Main Plan and Profile STA 5 and 00 to STA 14 and 00 1.5 MB
09 CU-03 - Water Main Plan and Profile STA 14 and 00 to STA 22 and 00 1.5 MB
10 CU-04 - Water Main Plan and Profile STA 22 and 00 to STA 27 and 50 2.1 MB
11 CU-05 - Water Main Plan and Profile STA 27 and 50 to STA 31 and 00 1.4 MB
12 CU-06 - Details 2.1 MB
13 CU-07 - Details 1.7 MB
14 CU-08 - Details 1.8 MB
15 CU-09 - Well Details 1.2 MB
16 CU-10 - Reservoir Grading Plan 3.3 MB
17 CU-11 - Reservoir Access Road 1.3 MB
18 CU-12 - Storm and Utility Plan 1.8 MB
19 CU-13 - Reservoir Details 1.6 MB
20 CU-14 - Reservoir Details 1.5 MB
21 CU-15 - Reservoir Site Piping and Details 1.5 MB
22 CU-16 - Wellhouse Piping Layout 2.2 MB
23 CU-17 - Wellhouse Piping Details 1.7 MB
24 CU-18 - Wellhouse Building Details 2.5 MB
25 CU-19 - Wellhouse Building Details 2.0 MB
26 CU-20 - Building Details 1.8 MB
27 TP1 - Process Plan 1.7 MB
28 TP2 - Process Isometric 1.8 MB
29 TP3 - Process Elevations and Backwash Sequence 1.7 MB
30 E-01 - Legend 1.5 MB
31 E-02 - Site Plan 932.5 KB
32 E-03 - Building Underground Plan 1.3 MB
33 E-04 - Building Aboveground Plan 1.3 MB
34 E-05 - Details 752.3 KB
35 E-06 - Conduit and Wire Schedule 1.9 MB
36 E-07 - One-Line Diagram and Panel Schedules 1.1 MB
37 E-08 - Well Pump Panel Wiring Diagram 712.4 KB
38 M-1 - Wellhouse Ventilation 1.5 MB