Newport South Bench Reservoir, Wells and Waterline Project
The Project consists of constructing a new water reservoir, developing two existing potable water wells, a water booster station, a green sand water treatment facility, electrical improvements and approximately 3,000 LF of water distribution main. Scope of work includes the following: Division 1 - General Requirements, Division 4 - Masonry, Division 5 - Metals, Division 6 - Wood Plastics and Composites, Division 7 - Thermal and Moisture Protection, Division 8 - Openings - Door and Windows, Division 9 - Finishes, Division 11 - Equipment, Division 13 - Special Construction, Division 15 - Mechanical, Division 16 - Electrical
Addendum #1
(click to expand/collapse)

Name | Size | |||
Addendum 1 | 9.4 MB |
Addendum #2
(click to expand/collapse)

Name | Size | |||
Addendum 2 | 6.9 MB |
Addendum #3
(click to expand/collapse)

Name | Size | |||
Addendum 3 | 446.2 KB |
Addendum #4
(click to expand/collapse)

Name | Size | |||
Addendum 4 | 128.0 KB |
Addendum #5
(click to expand/collapse)

Name | Size | |||
Addendum 5 | 83.5 KB |
Addendum #6
(click to expand/collapse)

Name | Size | |||
Addendum 6 | 159.1 KB |
Geotechnical Report
(click to expand/collapse)

Name | Size | |||
Geotechnical Engineering Report | 2.3 MB |