Newport South Bench Reservoir, Wells and Waterline Project

The Project consists of constructing a new water reservoir, developing two existing potable water wells, a water booster station, a green sand water treatment facility, electrical improvements and approximately 3,000 LF of water distribution main. Scope of work includes the following: Division 1 - General Requirements, Division 4 - Masonry, Division 5 - Metals, Division 6 - Wood Plastics and Composites, Division 7 - Thermal and Moisture Protection, Division 8 - Openings - Door and Windows, Division 9 - Finishes, Division 11 - Equipment, Division 13 - Special Construction, Division 15 - Mechanical, Division 16 - Electrical
  Addendum #1 (click to expand/collapse)
Name Size
Addendum 1 9.4 MB
  Addendum #2 (click to expand/collapse)
Name Size
Addendum 2 6.9 MB
  Addendum #3 (click to expand/collapse)
Name Size
Addendum 3 446.2 KB
  Addendum #4 (click to expand/collapse)
Name Size
Addendum 4 128.0 KB
  Addendum #5 (click to expand/collapse)
Name Size
Addendum 5 83.5 KB
  Addendum #6 (click to expand/collapse)
Name Size
Addendum 6 159.1 KB
  Geotechnical Report (click to expand/collapse)
Name Size
Geotechnical Engineering Report 2.3 MB