WCC Reclaimed Water (Re-Bid)

The Work will consist of construction of reclaimed water main pipe ranging in size from 1” to 8” in diameter across the WCC Campus, two trenchless undercrossings, connection of the reclaimed water main to irrigation system connection points, connection of the reclaimed water main to the boiler building including a backup potable water connection, connection of the reclaimed water main to the laundry facility including a backup potable water connection, surface restoration for the pipeline, and all other work necessary to complete the project as defined in the contract plans and these specifications.
  Plans (click to expand/collapse)
Order this section, price will be calculated by SQFT
This is available for download & digital takeoff to registered users Log in now
Order files below, price will be calculated by SQFT
Name Size
01_G-01 - Cover Sheet 1.5 MB
02_G-02 - Legend and General Notes 907.7 KB
03_G-03 - Sheet Key Map 1.4 MB
04_G-04 - Control Valve Locations 1.2 MB
05_CU-01 - Line A Plan & Profile 1.2 MB
06_CU-02 - Line A Plan & Profile 860.7 KB
07_CU-03 - Line A Plan & Profile 761.4 KB
08_CU-04 - Line A.2 Plan & Profile 1.1 MB
09_CU-05 - (Additive Alternate 1) Line A.3 Plan & Profile 913.9 KB
10_CU-06 - Line B Plan & Profile 1.1 MB
11_CU-07 - Line B Plan & Profile 748.1 KB
12_CU-08 - Line B.2 Plan & Profile 661.5 KB
13_CU-09 - Line B.3 Plan & Profile 905.2 KB
14_CU-10 - (Additive Alternate 1) Line C Plan & Profile 1.1 MB
15_CU-11 - (Additive Alternate 2) Line D Plan & Profile 1.2 MB
16_CU-12 - (Additive Alternate 2) Line E Plan & Profile 1.0 MB
17_CU-13 - (Additive Alternate 2) Line F Plan & Profile 1.1 MB
18_CU-14 - (Additive Alternate 2) Line G Plan & Profile 1.0 MB
19_CU-15 - Reclaimed Water Line Details 1.1 MB
20_CU-16 - Reclaimed Water Line Details 1.1 MB
21_CU-17 - Laundry Facility (Building G) Piping Schematic 593.5 KB
22_CU-18 - Laundry Facility (Building G) Piping Schematic 1.0 MB
23_CU-19 - Boiler Facility Piping Schematic 695.7 KB
24_E-1 - Symbols Legends Designations, Abbreviations, and General Notes 2.2 MB
25_E-2 - Electrical One-Line Diagram 911.2 KB
26_E-3 - Electrical Site Plan 1.3 MB
27_E-4 - Electrical Site Plan 832.9 KB
28_E-5 - Electrical Network Communiation Diagram 582.6 KB
29_E-6 - Electrical Reclaimed Water Valve Panel 826.9 KB
30_E-7 - Electrical Reclaimed Water Valve Panel Wiring 775.5 KB
31_E-8 - Electrical PLC-RW Analog Input Wiring Template 707.5 KB
32_E-9 - Electrical PLC-RW Discrete Input Wiring Template 666.9 KB
33_E-10 - Electrical PLC-RW Discrete Output Wiring Template 676.3 KB
34_E-11 - Electrical Schedules 976.1 KB