WCC Reclaimed Water (Re-Bid)

The Work will consist of construction of reclaimed water main pipe ranging in size from 1” to 8” in diameter across the WCC Campus, two trenchless undercrossings, connection of the reclaimed water main to irrigation system connection points, connection of the reclaimed water main to the boiler building including a backup potable water connection, connection of the reclaimed water main to the laundry facility including a backup potable water connection, surface restoration for the pipeline, and all other work necessary to complete the project as defined in the contract plans and these specifications.
  Addendum #1 (click to expand/collapse)
Name Size
Addendum 1 944.6 KB