WCC Reclaimed Water - Shelton

The Work will consist of construction of reclaimed water main pipe ranging in size from 1” to 8” in diameter across the WCC Campus, two trenchless undercrossings, connection of the reclaimed water main to irrigation system connection points, connection of the reclaimed water main to the boiler building including a backup potable water connection, connection of the reclaimed water main to the laundry facility including a backup potable water connection, a reclaimed water storage tank, a reclaimed water booster station, surface restoration for the pipeline, and all other work necessary to complete the project as defined in the contract plans and these specifications.
  Specifications - Batch File (click to expand/collapse)
Order this section, price will be calculated by SQFT
This is available for download & digital takeoff to registered users Log in now
Order files below, price will be calculated by SQFT
Name Size
WCC Reclaimed Water Project Contract Manual 01-28-21 8.4 MB
  Specifications - By Section (click to expand/collapse)
Order this section, price will be calculated by SQFT
This is available for download & digital takeoff to registered users Log in now
Order files below, price will be calculated by SQFT
Name Size
Cover & Table of Contents 490.9 KB
Division 00 - Procurement and Contracting Requirement 2.1 MB
Division 01 - General Requirements 872.7 KB
Division 02 - Existing Conditions 1.5 MB
Division 03 - Concrete 173.3 KB
Division 04 - Masonry 79.1 KB
Division 05 - Metals 90.4 KB
Division 06 - Wood, Plastics, and Composites 118.8 KB
Division 07 - Thermal and Moisture Protection 342.6 KB
Division 08 - Openings 117.0 KB
Division 09 - Finishes 226.2 KB
Division 22 - Plumbing 795.4 KB
Division 26 - Electrical 676.5 KB
Division 31 - Earthwork 163.4 KB
Division 32 - Exterior Improvements 237.7 KB
Division 33 - Utilities 148.6 KB