WCC Reclaimed Water - Shelton
The Work will consist of construction of reclaimed water main pipe ranging in size from 1” to 8” in diameter across the WCC Campus, two trenchless undercrossings, connection of the reclaimed water main to irrigation system connection points, connection of the reclaimed water main to the boiler building including a backup potable water connection, connection of the reclaimed water main to the laundry facility including a backup potable water connection, a reclaimed water storage tank, a reclaimed water booster station, surface restoration for the pipeline, and all other work necessary to complete the project as defined in the contract plans and these specifications.
Specifications - Batch File
(click to expand/collapse)

Name | Size | |||
WCC Reclaimed Water Project Contract Manual 01-28-21 | 8.4 MB |
Specifications - By Section
(click to expand/collapse)

Name | Size | |||
Cover & Table of Contents | 490.9 KB | |||
Division 00 - Procurement and Contracting Requirement | 2.1 MB | |||
Division 01 - General Requirements | 872.7 KB | |||
Division 02 - Existing Conditions | 1.5 MB | |||
Division 03 - Concrete | 173.3 KB | |||
Division 04 - Masonry | 79.1 KB | |||
Division 05 - Metals | 90.4 KB | |||
Division 06 - Wood, Plastics, and Composites | 118.8 KB | |||
Division 07 - Thermal and Moisture Protection | 342.6 KB | |||
Division 08 - Openings | 117.0 KB | |||
Division 09 - Finishes | 226.2 KB | |||
Division 22 - Plumbing | 795.4 KB | |||
Division 26 - Electrical | 676.5 KB | |||
Division 31 - Earthwork | 163.4 KB | |||
Division 32 - Exterior Improvements | 237.7 KB | |||
Division 33 - Utilities | 148.6 KB |