Water System Improvements

Schedule A Base Bid work consists of installing approximately 390 feet of 8-inch diameter water main to replace a line in the Rock-Main Alley and installing approximately 203 feet of 8-inch diameter water main to replace a line in Pine Street, including fire hydrant installation, service connections, trenching, backfill, and related work. Schedule B Additive Alternate work consists of grading, compaction, gravel surface restoration, and placing approximately 85 tons of hot mix asphalt in Pine Street.
  Plans (click to expand/collapse)
Order this section, price will be calculated by SQFT
Order files below, price will be calculated by SQFT
Name Size
01 - G-01 - Cover Sheet 3.4 MB
02 - CU-01 - Rock-Main Alley Water Main Plan & Profile STA 1 and 00 to STA 4 and 91 2.4 MB
03 - CU-02 - Pine Street Plan & Profile STA 1 and 00 to STA 3 and 26 2.2 MB
04 - CU-03 - Details 2.7 MB
05 - CU-04 - Details 1.9 MB