Water System Improvements
Schedule A Base Bid work consists of installing approximately 390 feet of 8-inch diameter water main to replace a line in the Rock-Main Alley and installing approximately 203 feet of 8-inch diameter water main to replace a line in Pine Street, including fire hydrant installation, service connections, trenching, backfill, and related work. Schedule B Additive Alternate work consists of grading, compaction, gravel surface restoration, and placing approximately 85 tons of hot mix asphalt in Pine Street.
Status
Bidding Closed
Bid Date2/18/21 11:00 am
Company & Contacts
Century West Engineering
Dan Remmick - dremmick@centurywest.com (509) 838-3810
Location
Spangle
Engineers Estimate: $130,000.00 to $155,000.00
Bidders may download electronic files at no cost. Printed documents are available, at Bidders expense, by choosing the “Order” option.