Skyview Reservoir Improvements

Schedule A Base Bid work consists of completing approximately 830 feet of 8-inch diameter water main to replace reservoir overflow pipe, surface restoration and related work. Schedule B Base Bid work consists of improvements to the SCADA/Telemetry system including new cloud-based telemetry system, and improvements to water system sites to provide for fully function telemetry system. Additional work includes installation of potable tank mixer in the water reservoir and associated electrical and controls. Schedule C Additive Alternate work consists of additional improvements to add SCADA/Telemetry controls to add the Hart Park Reservoir site.
  Plans (click to expand/collapse)
Order this section, price will be calculated by SQFT
This is available for download & digital takeoff to registered users Log in now
Order files below, price will be calculated by SQFT
Name Size
01 - G-01 - Cover Sheet 1.1 MB
02 - G-02 - Legend & General Notes 927.7 KB
03 - CU-01 - Overflow Pipe Plan and Profile STA 1+00 to STA 5+00 1.1 MB
04 - CU-02 - Overflow Pipe Plan and Profile STA 5+00 to STA 8+55 1.0 MB
05 - CU-03 - Skyview Reservoir Site Plan 798.8 KB
06 - CU-04 - Details 1.2 MB
07 - E0 - Electrical Legend 3.9 MB
08 - E1 - Electrical Schedules 3.2 MB
09 - E2 - Vicinity Map 3.3 MB
10 - E3 - Partial Radio Network Diagram 2.6 MB
11 - E4 - Skyview Water Tank Electrical Plan 1.8 MB
12 - E5 - Skyview Water Tank Electrical Details 2.6 MB
13 - E6 - Well 1 Electrical Plan 2.2 MB
14 - E7 - Well 2 Electrical Plan 2.1 MB
15 - E8 - Well 5 Electrical Plan 3.0 MB
16 - E9 - Hart Park Reservoir Electrical Plan 2.2 MB