Lakeland Village Utility Replacement

The Work comprises the removal and installation of steam piping, condensate piping, water piping, electrical conduit, associated valves, piping accessories, insulation, excavation/backfill (for site piping), concrete patching, and connections to existing piping systems.
  Addendum #1 (click to expand/collapse)
  Addendum #2 (click to expand/collapse)
Name Size
Signed Addendum 2 Lakeland 2.1 MB