AHCC Reclaimed Water Implementation

The Work will consist of construction of reclaimed water main pipe ranging in size from 1” to 8” in diameter across the AHCC Campus, two trenchless undercrossings, connection of the reclaimed water main to 6 irrigation system connection points, connection of the reclaimed water main to the boiler building including a backup potable water connection, connection of the reclaimed water main to the laundry facility including a backup potable water connection, surface restoration for the pipeline, and all other work necessary to complete the project as defined in the contract plans and these specifications.
  Specifications (click to expand/collapse)
Order this section, price will be calculated by SQFT
This is available for download & digital takeoff to registered users Log in now
Order files below, price will be calculated by SQFT
Name Size
01 - Cover 153.1 KB
02 - Division 0 - Bidders Information 3.6 MB
03 - Division 1 - General Requirements 887.3 KB
04 - Division 2 1.9 MB
05 - Division 3 173.0 KB
06 - Division 22 1.2 MB
07 - Division 31 174.2 KB
08 - Division 32 237.5 KB