Inchelium Highway Repairs

The project generally consists of reconstructing approximately 425 feet of roadway, including 18,251 C.Y of Roadway Excavation, 20,074 C.Y. of imported gravel borrow, 343 tons of asphalt paving, 450 feet of Type 31 Beam Guardrail, drainage improvements, traffic control and related site restoration.
  Plans (click to expand/collapse)
Order this section, price will be calculated by SQFT
This is available for download & digital takeoff to registered users Log in now
Order files below, price will be calculated by SQFT
Name Size
01 - G-01 - Cover Sheet 3.2 MB
02 - G-02 - Legend and General Notes 3.3 MB
03 - CG-01 - Roadway Section 3.5 MB
04 - CG-02 - Alignment and Row Plan 3.2 MB
05 - CG-03 - Inchelium Highway Plan & Profile 3.5 MB
06 - CG-04 - Roadway Site Preperation 3.8 MB
07 - CG-05 - Roadway Grading Plan 3.7 MB
08 - CG-06 - Drainage Plan - Site Plan 2.5 MB
09 - CG-07 - Bypass Restoration Plan 3.2 MB
10 - CG-08 - Details 1 2.8 MB
11 - CG-09 - Details 2 3.6 MB
12 - CG-10 - Temporary Erosion and Sediment Control Plan 3.9 MB
13 - TC-01 - Traffic Control Plan One-Lane, Two-Way Traffic with Flaggers 2.2 MB
14 - TC-02 - Traffic Control Plan Shoulder Closure - High Speed 1.7 MB
15 - TC-03 - Traffic Control Plan Alternating One-Way Traffic Temp. Signal Control 2.5 MB