Inchelium Highway Repairs
The project generally consists of reconstructing approximately 425 feet of roadway, including 18,251 C.Y of Roadway Excavation, 20,074 C.Y. of imported gravel borrow, 343 tons of asphalt paving, 450 feet of Type 31 Beam Guardrail, drainage improvements, traffic control and related site restoration.
Addendum #1
(click to expand/collapse)

Name | Size | |||
Addendum 1 Packet 7-16-20 signed | 388.5 KB |
Addendum #2
(click to expand/collapse)

Name | Size | |||
Addendum _2 Packet July 23-2020-signed | 7.6 MB |
Addendum #3
(click to expand/collapse)

Name | Size | |||
Addendum 3 packet 7-24-20-signed | 244.3 KB |
Addendum #4
(click to expand/collapse)

Name | Size | |||
Inchelium Highwy Addendum 4 Packet | 351.5 KB |