2020 Water System Improvements Project

The 2020 Water System Improvements Project consists of constructing approximately 2000 feet of 8-inch PVC water main, replacing select water meters, installing a variable frequency drive (VFD) and motor at Well #8, and installing a new fire hydrant at the intersection of 3rd Street and Wahl Lane. The water main work consists of approximately 1300 feet along 7th Street and approximately 700 feet along Lutcher Ave. The water main work includes select replacement of street surfacing. Well #8 is located at the north east corner of 1st Street and Michigan Ave. The well is housed in a building with a removable shell. The work will include removing the existing soft start and motor as well as installing the new VFD and motor.

Status

Bidding Closed

Bid Date7/2/20 11:00 am

Company & Contacts

Century West Engineering

Patrick Sheehy psheehy@centurywest.com   (509) 838-3810

Location

Lind, WA

Project Estimate: $500k and $530k for base bid. $700k and $733k for base bid and all alternates.

Bidders may download electronic files at no cost. Printed documents are available, at Bidders expense, by choosing the “Order” option.