Electric City Lift Station Replacement Project

The project generally consists of demolition and replacement of the existing lift station with a new package lift station. One of the pumps in the existing lift station will be salvaged and used in the new lift station and the existing building will be preserved and control panels installed inside this building. The project will also include approximately 50 feet of 10-inch PVC gravity sewer main and 50 feet of 6-inch force main and associated work. In addition to replacement of the lift station this project will include installation of a new package backup generator.
  Plans (click to expand/collapse)
Order this section, price will be calculated by SQFT
This is available for download & digital takeoff to registered users Log in now
Order files below, price will be calculated by SQFT
Name Size
01 - G-01 - Cover 1.5 MB
02 - CU-01 - Existing Site Plan 555.1 KB
03 - CU-02 - Demolition Plan 95.6 KB
04 - CU-03 - Lift Station Replacement Plan 134.9 KB
05 - CU-04 - Wet Well Details 128.2 KB
06 - CU-05 - Details 137.8 KB
07 - E-1 - Electrical Legend and Abbreviations 2.1 MB
08 - E-2 - Electrical One-Line Diagram 1.5 MB
09 - E-3 - Electrical Site Plan 759.3 KB
10 - E-4 - Electrical Power and Control Plan 786.9 KB
11 - E-5 - Electrical Lighting and Receptacle Plan 620.3 KB
12 - E-6 - Electrical Details 893.5 KB
13 - E-7 - Electrical Wiring Diagrams 796.4 KB
14 - E-8 - Partial Radio Network Diagram 902.3 KB
15 - E-9 - Electrical Demolition Plan 1.4 MB